Our projects

Our solutions, which are a combination of IT and technical tools, serve to improve comfort, reduce energy consumption, optimize production processes and reduce operating costs. Check how we have implemented these elements in our clients' investments.


FOCUS PARK

Zielona Góra, ul. Wrocławska 17

In 2021 r. the expansion of the Focus Mall Zielona Góra shopping center was completed, the main contractor of which was our Partner - Mostostal Warszawa. The task was to revitalize and arrange the historic buildings of the 19th-century Polish Wool factory complex and to add a new part, including multi-storey car parks and two storeys of the gallery. For this investment, on behalf of Mostostal Warszawa, we made teletechnical installations in the design and build formula. Our work included the design and installation of the Voice Alarm System, Fire Alarm System, Access Control, CCTV with the function of counting people and reading tables, Intercom, LAN, CO and LPG detection systems.


Kepler Science Center - Venus Planetarium

Zielona Góra, ul. gen. W. Sikorskiego 10

The Kepler Science Center - Planetarium WENUS was an important project for Zielona Góra and the surrounding area. The main contractor was Skanska, which undertook the design and execution of construction works, the design and installation of projection equipment, the reconstruction and construction of the former Wenus cinema building together with the reconstruction and construction of the associated technical, communication and parking infrastructure. As a subcontractor, we have performed tasks in the field of: automation of air handling units, automation of air conditioning installations, BMS, LAN, CCTV, Intrusion and Burglary Signaling System, Access Control, Fire Alarm System, Smoke Ventilation System, Sound System.


National Museum in Szczecin — Dialogue Center "Przełomy"

Szczecin, pl. Solidarności 1

Dialogue Center in Szczecin is a two-story building in the center of Szczecin, which is used to conduct the activities of the National Museum. It was an important investment and implementation, both for us and for our Partner - Skanska. On the above-ground floor there are: an entrance hall, a cloakroom, a cash register, a cafe with facilities, office and security rooms. On the underground level, an exhibition hall was built - a place of permanent exhibition together with a room of temporary exhibitions. As part of the implementation, at the request of the main contractor, we prepared designs and carried out the assembly of the Fire Alarm System, Burglary and Robbery Signaling Systems, Access Control and CCTV.


National Music Forum in Wrocław

Wrocław, plac Wolności 1

Total surface: 48 500 m2Cubature : 257 000 m3 As part of the implementation, we were responsible for the design and installation of such installations as: Integrated SMS Security Management System, Fire Alarm System, Gas Extinguishing System, VESDA Early Fire Detection System, CCTV System, Burglary and Assault Signaling System, Access Control System, Structured Cabling


The Palm House in Zielona Góra

Zielona Góra, ul. Wrocławska 12

Total surface: 3 357 m2Cubature: 23 530 m3 As part of the implementation, we were responsible for the design and installation of such installations as: Smoke Ventilation System, Industrial Television System, Burglary and Assault Signaling System, Access Control System, Structured Cabling, Teletechnical Sewerage.


Santander inWrocław

Wrocław

It was one of our largest projects, not because of the size, but because of the complexity of the work. The Santander building (formerly BZWBK) is a complex facility in terms of building automation. For our contribution to the implementation of this investment, we received two important distinctions from SIEMENS: for the Best Company in the Field of Automation and for the Best Company in the Field of Fire Safety Systems.


Toms factory

Nowa Sól, ul.Śląska 3

Nowa Sól is dynamically developing its industrial zone attracting new investors. Between 2018 and 2019, the Toms industrial plant was built there. The implementation included the construction of the factory with buildings and accompanying infrastructure. At the request of the main contractor, Adamietz, we equipped the plant with: Fire Alarm System, Access Control, LAN, CCTV, Building Automation System.

Interior Industry Technology and Logistics Park

Nowa Sól, ul. Inżynierska 8

Total surface: 3 660 m2Cubature: 23 500 m3 As part of the implementation, we were responsible for the design and installation of such installations as: Integrated Security Management System, DATA CENTER, Fire Alarm System, VESDA Early Fire Detection System, Gas Extinguishing System, CCTV System, Burglary and Robbery Alarm System, Access Control System , Structured cabling, Teletechnical ducting.